| |
Scheduling
Page history last edited by Erica 1 yr ago
Scheduling
- Shows
- Sign up for Time Spots Early
- Be Flexible - Allow for Dynamic Changes
- Scheduling Will Be By Area/By Interest Track/ and By Time Slot With special care for zones of sound conflict and multi-area coordination
- All Schedules should be optimized in a circular pattern - each show steals neighboring crowd.
- Prioritize one shot shows as opposed to repeating Shows
- Lots and Lots of Signage and Communication
Scheduling
|
|
Tip: To turn text into a link, highlight the text, then click on a page or file from the list above.
|
|
|
Comments (0)
You don't have permission to comment on this page.